路沿石模具在各处安装需要注意的事
发布人:管理员   发布时间:2020-12-8

路沿石模具安装时要用细线控制路沿石的顺直度,挂线时要保证线绳紧绷,路沿石摆放好之后再用水平尺进行检查,要求无错台、无错缝。
During the installation of curbstone mold, the smoothness and straightness of curbstone should be controlled with thin line, and the wire rope should be tight when hanging the line. After the curb is placed, the level ruler should be used to check, and there should be no wrong platform and joint.

在收水井处,需要将路沿石更换为两块立篦式卡边石,且其位置要安装正确。需要切割的地方要保证路沿石切割的完整性且长度不小于60cm,不得使用小块进行拼接,卡边石不可切割。
At the water receiving well, the curb stone should be replaced with two vertical grate type curbstones, and the location should be correct. The cutting integrity of curbstone shall be ensured and the length shall not be less than 60cm. Small pieces shall not be used for splicing, and the curb shall not be cut.

    

在铺设砂浆时,应保证砂浆饱满无空洞,防止由于砂浆缺少造成的路沿石下沉。两块路沿石模具之间的接缝不得大于8mm,且要用水泥砂浆对其进行勾缝,并去除表面多余砂浆。
When laying the mortar, the mortar should be full and free of cavities, so as to prevent the settlement of the curbstone caused by the lack of mortar. The joint between two curbstone molds shall not be greater than 8mm, and it shall be pointed with cement mortar, and the surplus mortar on the surface shall be removed.

对于机非分隔带的路沿石与人行道两端的路沿石,安装时要注意两侧路沿石的距离,要保证树穴卡边石与人行道砖安装合适,避免对树穴卡边石和面包砖进行切割或铺设缝隙过大。对于路面渐变段处的路沿石,渐变处要满足棱角分明,不可出现圆弧。
For the edge stones of the machine-made partition belt and the curbs at both ends of the sidewalk, the distance between the curbs on both sides should be paid attention to during installation, and the installation of the curbstone and the sidewalk brick at the tree hole should be ensured to be appropriate, and the cutting or laying gap of the block stone and bread brick in the tree hole should be avoided. For the curbstone at the transition section of the pavement, the edge of the transition should be clear and no arc should appear.